Interim fix CLM_500_iFix005.zip This interim fix is only valid for the CLM 5.0.0.0 release. After this interim fix, upgrade to CLM 5.x or later, i.e. any post 5.0.2 release. CONTENTS OF THE INTERIM FIX 1. Server patch file: CLM_server_patch_5.0.0.0-CALM50M-I20141103-2332.zip 2. Rational Team Concert Eclipse client update site: NONE 3. Additional fixes (see below) 4. readme.txt (this file) 1. SERVER PATCH Note: Before you install the server patch file CLM_server_patch_5.0.0.0-CALM50M-I20141103-2332.zip, verify that no other test fixes or hot fixes are installed. If other fixes are installed, contact IBM Software Support. For a CLM deployment on a single server, complete the following steps once. For a distributed CLM deployment, complete the same steps on each server. To install the server patch: a. Stop the CLM server. b. Verify whether the following directory exists: /server/patch. -If the directory exists, back up and remove its contents. -If the directory does not exist, create it. c. Copy the server patch file CLM_server_patch_5.0.0.0-CALM50M-I20141103-2332.zip into the /server/patch directory. d. Start the server. For a distributed CLM deployment, complete the same steps on each server. To uninstall the server patch: a. Stop the CLM server. b. Back up and remove the contents of the following directory: /server/patch c. Start the CLM server. For a distributed CLM deployment, complete the same steps on each server. This server patch contains fixes for the following defects: [APAR ID] [Maintenance Item Summary] [Maintenance Item URL] +-- Product RJF Fixed in release 5.0.1: [APAR PI19914] [Rational DM Express Setup Errors] [https://jazz.net/jazz/resource/itemName/com.ibm.team.workitem.WorkItem/316229] [APAR PI21302] ["Unresponsive script" is displayed during selection of report parameters] [https://jazz.net/jazz/resource/itemName/com.ibm.team.workitem.WorkItem/326165] [APAR PI21445] [Deferred operation failed during bulkUpdate with SQL error] [https://jazz.net/jazz/resource/itemName/com.ibm.team.workitem.WorkItem/316386] +-- Product RMS Fixed in release 5.0.1: [APAR PI19530] [Improve how 'not a binding' is determined in SPARQL from View queries ] [https://jazz.net/jazz03/resource/itemName/com.ibm.team.workitem.WorkItem/90302] [APAR PI19914] [About dialog does not display patch extension information] [https://jazz.net/jazz03/resource/itemName/com.ibm.team.workitem.WorkItem/89280] [APAR PI19914] [RM memory consumption increased during a 7-day long run] [https://jazz.net/jazz03/resource/itemName/com.ibm.team.workitem.WorkItem/88056] [APAR PI23288] [RM Suspicion Indexing taking long time to complete] [https://jazz.net/jazz03/resource/itemName/com.ibm.team.workitem.WorkItem/89994] Fixed in release 5.0.2: [APAR PI16245] [Certain view queries with sophisticated link patterns / parameters poorly perform] [https://jazz.net/jazz03/resource/itemName/com.ibm.team.workitem.WorkItem/87712] [APAR PI19401] [Unable to create custom links between two team areas] [https://jazz.net/jazz03/resource/itemName/com.ibm.team.workitem.WorkItem/88711] [APAR PI19914] [Don't return a meaningless Exception class name as an error message, if we also have a full Message_ID and message from the server] [https://jazz.net/jazz03/resource/itemName/com.ibm.team.workitem.WorkItem/90942] [APAR PI22500] [Users with JazzProjectAdmins role can initiate a RequisitePro project import, but the import fails] [https://jazz.net/jazz03/resource/itemName/com.ibm.team.workitem.WorkItem/90307] [APAR PI23011] [Query to determine whether resource has OSLC link is poor performing ] [https://jazz.net/jazz03/resource/itemName/com.ibm.team.workitem.WorkItem/92013] [APAR PI23377] [Reports in module context takes long time and cause the report to not be generated with CRRRW7557E error] [https://jazz.net/jazz03/resource/itemName/com.ibm.team.workitem.WorkItem/90271] [APAR PI24181] [Exporting projects created from templates while below version 4.0.5 will not export bookmarks causing empty folders on import. ] [https://jazz.net/jazz03/resource/itemName/com.ibm.team.workitem.WorkItem/90628] [APAR PI24379] [Large ReqIF files can fail to import due to insufficient timeout value] [https://jazz.net/jazz03/resource/itemName/com.ibm.team.workitem.WorkItem/90333] [APAR PI25054] [Requirements Data Collection Job Hangs after Server Rename] [https://jazz.net/jazz03/resource/itemName/com.ibm.team.workitem.WorkItem/90587] [APAR PI25187] [CRRRW7557E timeout error when generating large reports from views] [https://jazz.net/jazz03/resource/itemName/com.ibm.team.workitem.WorkItem/91744] [APAR PI26127] [Error CRRRW7346E when saving an artifact with a table in IE9] [https://jazz.net/jazz03/resource/itemName/com.ibm.team.workitem.WorkItem/91659] [APAR PI26658] [Cannot access audit history for artifacts upgraded from 4.x to 5.x] [https://jazz.net/jazz03/resource/itemName/com.ibm.team.workitem.WorkItem/91392] [APAR PI26689] [Attribute modifications for multi-value enum attributes are not saved when done from Module -> Selected Artifact] [https://jazz.net/jazz03/resource/itemName/com.ibm.team.workitem.WorkItem/91796] Fixed in release 5.x: [APAR PI28365] [CSV Export performs very poorly when the exported View definition contains Link terms] [https://jazz.net/jazz03/resource/itemName/com.ibm.team.workitem.WorkItem/92058] +-- Product RQM Fixed in release 5.0.1: [APAR PI14100] [Not able to run a test suite with more than 10 test cases on a remote machine unless you view each test case in the run suite dialog.] [https://jazz.net/jazz02/resource/itemName/com.ibm.team.workitem.WorkItem/117128] [APAR PI17486] [Multiple steps created when using RFT 8.5.1.X and RQM 4.0.6+ for Manual Test Script Recording.] [https://jazz.net/jazz02/resource/itemName/com.ibm.team.workitem.WorkItem/114643] [APAR PI18589] [CRJAZ0368E when saving a 1/1000+ test plans referencing ReqPro requirements.] [https://jazz.net/jazz02/resource/itemName/com.ibm.team.workitem.WorkItem/116796] [APAR PI20767] [Cannot create a new CQ defect from a test result step.] [https://jazz.net/jazz02/resource/itemName/com.ibm.team.workitem.WorkItem/117387] [APAR PI21934] [AQXIN5014E error when generating PDF reports on test artifacts containing external IDs with URL-reserved characters.] [https://jazz.net/jazz02/resource/itemName/com.ibm.team.workitem.WorkItem/121968] [APAR PI21940] [Backport to 5.0 iFix 003 Error "Unable to load the content. Override createTextPredicate" when filter the test scripts in keyword (117229)] [https://jazz.net/jazz02/resource/itemName/com.ibm.team.workitem.WorkItem/119445] [APAR PI22794] [Backport to 5.0 iFix 003 Exception while updating the script (script name); Failed to find delta predecessor (119754)] [https://jazz.net/jazz02/resource/itemName/com.ibm.team.workitem.WorkItem/119763] [APAR PI22795] [Backport to 5.0 iFix 003 Build information on a test suite result is not displayed in the pdf file generated via the "Export Summary" (118913)] [https://jazz.net/jazz02/resource/itemName/com.ibm.team.workitem.WorkItem/120000] [APAR PI22896 ] [Backport to 5.0 iFix 003 When running a test suite, if there is no machine associated with the step result it renders 'Local Computer' (119171)] [https://jazz.net/jazz02/resource/itemName/com.ibm.team.workitem.WorkItem/120001] [APAR PI22901] [Backport to 5.0 iFix 003 Adapter search for Test Suite execution does not honor TSER's test environment. Instead it takes environment of suite step although they are unassigned (115680)] [https://jazz.net/jazz02/resource/itemName/com.ibm.team.workitem.WorkItem/120002] [APAR PI24051] [[Export to PDF] Export a large test plan to PDF failed with error.] [https://jazz.net/jazz02/resource/itemName/com.ibm.team.workitem.WorkItem/126817] [APAR PI25970] [QM Test execution records and results do not appear in Test Plan Snapshot when Exporting to PDF] [https://jazz.net/jazz02/resource/itemName/com.ibm.team.workitem.WorkItem/124200] [APAR PM83738] [Backport to 5.0 iFix 003 Exception while updating the script (script name); Failed to find delta predecessor (113877)] [https://jazz.net/jazz02/resource/itemName/com.ibm.team.workitem.WorkItem/120131] Fixed in release 5.0.2: [APAR PI23300] [Backport to 5.0 iFix 003 QM Test Suite Execution : “Error: Deferred Operation failed” (120338)] [https://jazz.net/jazz02/resource/itemName/com.ibm.team.workitem.WorkItem/120432] [APAR PI24044] [Major TCER loading inefficiencies / scalability concerns] [https://jazz.net/jazz02/resource/itemName/com.ibm.team.workitem.WorkItem/123803] +-- Product RTC Fixed in release 5.0.1: [APAR PI15910] [WebUI - Duplicate attributeDefinition id found in PA source when using "reuse existing attribute"] [https://jazz.net/jazz/resource/itemName/com.ibm.team.workitem.WorkItem/329063] [APAR PI16115] [Contributor List not usable due to exception on loading ArtifactListView] [https://jazz.net/jazz/resource/itemName/com.ibm.team.workitem.WorkItem/330551] [APAR PI16549] [Loading a Plan owned by a Team area with more than 2048 members throws error] [https://jazz.net/jazz/resource/itemName/com.ibm.team.workitem.WorkItem/315121] [APAR PI17733] [Plan editor shows archived work item categories in Filed Against column] [https://jazz.net/jazz/resource/itemName/com.ibm.team.workitem.WorkItem/321025] [APAR PI18284] [Overlapping timespans are not handled correctly while adding timespans in traditional scheduler] [https://jazz.net/jazz/resource/itemName/com.ibm.team.workitem.WorkItem/322915] [APAR PI18631] [Backport of Build Forge connections should retry on APIAccessDenied exceptions] [https://jazz.net/jazz/resource/itemName/com.ibm.team.workitem.WorkItem/334047] [APAR PI19189] [[wi 318737] - Length error is thrown on loading plans] [https://jazz.net/jazz/resource/itemName/com.ibm.team.workitem.WorkItem/322916] [APAR PI20749] [SCM unusable with Oracle DB after upgrade to 5.0] [https://jazz.net/jazz/resource/itemName/com.ibm.team.workitem.WorkItem/320176] [APAR PI21525] [Buildmap Storage Area and JFS Indexes are growing too large] [https://jazz.net/jazz/resource/itemName/com.ibm.team.workitem.WorkItem/323642] [APAR PI21994] [OSLC parameter to query RTC user details using email fails status 500] [https://jazz.net/jazz/resource/itemName/com.ibm.team.workitem.WorkItem/324301] Fixed in release 5.0.2: [APAR PI23359] [Appropriate Overlay images not visible based on the status of the item] [https://jazz.net/jazz/resource/itemName/com.ibm.team.workitem.WorkItem/330917] [APAR PI22474] [Backport of the TeamBuildService has instances where the IN clause can cause problems on Oracle] [https://jazz.net/jazz/resource/itemName/com.ibm.team.workitem.WorkItem/327102] [APAR PI24384] [Plan load takes a massive amount of time in getWorkItemAttributeValueSets] [https://jazz.net/jazz/resource/itemName/com.ibm.team.workitem.WorkItem/331882] [APAR PI26618] [Cannot compare workspaces with more than 2048 components] [https://jazz.net/jazz/resource/itemName/com.ibm.team.workitem.WorkItem/334462] 2. RATIONAL TEAM CONCERT ECLIPSE CLIENT UPDATE SITE To install the client update site: a. Extract the update site file to the computer where the client is installed. b. In the Rational Team Concert client, click Help > Install New Software. c. In the Install window, click Add. d. In the Add Repository window, click Local and navigate to the extracted update site file. The update site root directory contains a site.xml file. e. Select the patches to install. f. If you agree to the terms, accept the license agreement and click Install. g. After the installation is complete, restart the Rational Team Concert client. To update the feature patch, you can install the new version directly over the old patch. You do not have to uninstall the old patch. To uninstall the client update site: a. In the Rational Team Concert client, click Help > About Rational Team Concert > Installation Details. b. Select the patches to uninstall and click Uninstall. c. After the uninstall process is complete, restart the Rational Team Concert client. WARNING: If you run the uninstall process on a Rational Team Concert client that was installed by using a .zip file, the feature patch will be removed along with the original feature. Removing the patch will break the functionality of the affected feature. For a client that was installed by using a .zip file, reinstall the features by downloading the Rational Team Concert p2 repository from Jazz.net, and use the same installation steps with the following exception. For step d, click Archive and select the p2 repository .zip file and install the Rational Team Concert feature. This step will remove the patched plug-ins and replace the missing features with the original versions of the feature from the p2 repository. If you run the uninstall process on a Rational Team Concert client that was installed by using the p2 repository, to remove the patch, you must uninstall the entire Rational Team Concert p2 feature and then reinstall the entire Rational Team Concert feature through the p2 repository. This client update site contains fixes for the following defects: [APAR ID] [Maintenance Item Summary] [Maintenance Item URL] +-- RTC Client Fixes 3. ADDITIONAL FIXES: (if they exist) No patch non-compliant work items found. 4. KNOWN ISSUES a. An empty /server/patch folder must exist when a patch is applied. If you delete the /server/patch folder when you remove existing patch files, errors occur when the server restarts. For details, see Work Item 315482 (https://jazz.net/jazz/resource/itemName/com.ibm.team.workitem.WorkItem/315482)