IBM Power Subsystem Firmware Update
for use with
System Firmware Release 240 Levels 332 and 338 ONLY:
pSeries 9119-590
pSeries 9119-595
iSeries 9406-595
pSeries 9118-575
DATE: January 25, 2008
Table of Contents
1.0 Firmware Change History
2.0 General Information
2.0.0 Where to Obtain the Firmware
2.0.1 How to Load the Firmware
2.1 Cautions and Important Notes
Code Level |
Description |
BP240_219 |
GA7 Service Pack 7:
Fix for an erroneous System Reference Code stating that a power supply is too hot
Fix for a false System Reference Code on 9118-575 power supplies
Fix for an incorrect location code for some cable errors
Fix for the frame 'Pending Authentication' error on the Hardware Management Console (HMC)
Fix for the 'Concurrent I/O Drawer Add' feature on the Hardware Management Console (HMC)
Added informational messages indicating recovery from high room temperature and high internal temperature conditions
|
BP240_214 |
GA7 Service Pack 6:
Fix to help prevent a DHCP server from assigning duplicate IP addresses to the Bulk Power Controllers (BPCs)
|
BP240_211 |
GA7 Service Pack 5:
Update to the list of possible faulty devices for BPC to BPC communication failures
Fix for incorrect location codes on cable faults
Fix for highly intermittent power on failure of older level I/O drawers (drawers that were migrated from 7040 systems)
Update to simplify the BPC procedure to restore default IP addreses
Update to adjust the connector test on field replacements of MCMs
|
BP240_203 |
GA7 Service Pack 4:
Fix to prevent corruption of Bulk Power fan controller
Fix for a problem servicing CEC power supplies
Fix for an erroneous System Reference Code reported against CEC power supplies
|
BP240_197 |
GA7 Service Pack 3:
Fixes for erroneous System Reference Codes reported against I/O drawer power supplies
Fixes for erroneous System Reference Codes reported against CEC power supplies
Fixes for erroneous System Reference Codes reported against Node power supplies
|
BP240_190 |
GA7 Service Pack 2:
Fix for an intermittent problem that caused improper initialization
of pSeries High Performance Switch after toggling the Frame UEPO Switch
|
BP240_179 |
GA7 Service Pack 1:
- Fix for a problem that caused the BPC to reboot unexpectedly in larger 9118-575 systems
- Fix for a problem that prevented changing the frame number
- Support for improved IP reset procedure (only 1 reboot required)
|
BP240_168 |
GA7: General Availability
- Support for the GS processor on the 9118-575
- Fixes for erroneous System Reference Codes reported against I/O drawer power supplies
|
The Power Subsystem Firmware level contained in this update is:
BP240_219
The individual internal Power FRU code levels are:
Internal FRU Name | Code Level |
(hex) | (decimal) |
BPC 196 | 000A | 10 |
BPC DSP | A387 | 41863 |
BPR | A01A | 40986 |
CEC MDA-S | 039B | 923 |
CEC DCA-SQ | 0012 | 18 |
Node DCA-SIH | 000F | 15 |
I/O DCA-BC | 003E | 62 |
I/O MDA-BC | 0005 | 5 |
I/O DCA-BCS | 003A | 58 |
I/O MDA-BCS | 0406 | 1030 |
HPS DCA-F | 003D | 61 |
HPS MDA-F | 0394 | 916 |
This package provides updated Power Subsystem Firmware for use on the following systems only:
- pSeries 9119-590
- pSeries 9119-595
- pSeries 9118-575
- pSeries Powered Expansion Rack
- pSeries High Performance Switch in any of the above Systems
- pSeries High Performance Switch Multi-rack Configuration
- iSeries 9406-595
Do not use on any other systems. The package contains downloadable
Firmware for some or all of the following power subsystem components: BPC
(Bulk Power Controller), BPR (Bulk Power Regulator), DCA (Distributed Converter
Assembly and MDA (Motor Drive Assembly).
This firmware can be found at the following locations:
IMPORTANT NOTE:
Before attempting to load this firmware please ensure that your HMC software
has been upgraded to the latest level for "servers with POWER5 processors". HMC
software packages can be found at:
https://www14.software.ibm.com/webapp/set2/sas/f/hmc/home.html
The instructions regarding how to query, obtain, install and remove firmware
levels can be found on the following IBM Infocenter Page:
Getting server firmware and power subsystem firmware fixes and upgrades
- Never Turn Off the UEPO switch (red switch) During the Power Subsystem
Firmware Update Process --
the update will fail, and the process must be repeated. Also,
the power component being loaded could be permanently disabled.
- Never Log Off of the HMC During the Power Subsystem Firmware Update
Process --
the update will fail, and the process must be repeated.
- Service any existing problems with the Power Subsystem prior to
attempting to load Power Subsystem Firmware from the HMC. Outstanding
problems can cause the Power Subsystem to be in an N-mode power state
(which means there has been a loss of redundancy) and can prevent the HMC
from being able to load the Power Subsystem Firmware.