To upgrade to the fix pack version 7.5.0.3, do the following. |
1. Ensure that you have followed the "Installation Instructions" section in the download link before proceeding. |
2. If you need to use the Fix Pack for EMD, delete the connector project in WebSphere Integration Developer, import the new RAR file, and apply the enterprise information system (EIS) specific dependency files. |
a. Open the Java build path for the SCA module and remove the Connector project that is selected on Projects tab. |
b. Open the dependency editor and remove the connector project. |
c. Delete the connector project from the workspace. |
d. Import the new RAR file. Add any dependency files from EIS specific application-specific information as needed. |
e. Open the Java build path for the SCA module and select the Connector project that is selected on the Projects tab. |
e. Open the dependency editor and add the connector project if it is not already present and select Deploy with Module. |
3. If you need to update deployed applications on WebSphere Process Server, do the following: |
a. Select Update for the corresponding application on the WebSphere Process Server administrative console. |
b. Select Single Module with a relative path as name of the RAR file - CWYEM_EMail.rar. |
c. Click Browse on the local file system to select the updated RAR file that has the changes. |
d. Select the default values in the remaining steps and click Finish. This will ensure that existing configurations, for example, are not changed and that only JAR files will be updated. |